Over engineered cycle way!

The riverside cycle way is unbelievably over engineered! 6″ reinforced concrete on 12″ hardcore with 3″ concrete blocks on top! Come the revolution will be handy for the tanks! Be interesting to get John Isherwoods take on it! 01223 457392

Photo

Sent from my iPhone 0044 (0)797 1428715
Twitter: geoffjones
Visit my website:
http://geoffjones.com

2 thoughts on “Over engineered cycle way!”

  1. Seriously over engineered. In Ontario Canada we don’t use any re-bar in any concrete walkway.

  2. Steve thanks for the comment – Its amazing the amount of work that has been put into it for a few hundred yards!

Comments are closed.